In your required reading by Fontaine (2016), examine the information on technical risks to projects:
- Identify an “intolerable technical risk” on a project with which you are familiar, or on one that you can research.
- Describe the issue that created the intolerable technical risk and describe the risk itself.
- Describe the treatment plan using cost-benefit analysis, where the risk severity is reduced to an acceptable level. (A risk register is not required for the paper with this option.)
