Describe the issue that created the intolerable technical risk and describe the risk itself.

In your required reading by Fontaine (2016), examine the information on technical risks to projects:

  1. Identify an “intolerable technical risk” on a project with which you are familiar, or on one that you can research.
  2. Describe the issue that created the intolerable technical risk and describe the risk itself.
  3. Describe the treatment plan using cost-benefit analysis, where the risk severity is reduced to an acceptable level. (A risk register is not required for the paper with this option.)